The Existing steel plant comprises 3 x 100 TPD Sponge Iron
Kiln and 10 MW/hr (WHRB & FBC Boiler) captive power plant. In the proposed
expansion, 2 x 25 MT Electric Induction Furnace will be installed.
In the existing plant, fresh water requirement was 221.02
KLD. After the proposed expansion, the requirement will be 364.33 KLD which
includes the drinking and sanitation.
No comments:
Post a Comment